Skip to main content
Access to material may be restricted.
3 Sacramento Street offline
Access to material may be restricted.
Access to material may be restricted.

3 Sacramento Street offline

Project NumberFCOL 2023-0020
CAPS Activity Code008353
Project DescriptionThe scope of this project will entail a heating upgrade (boiler and controls on individual radiators), insulation for the entire building, a fire blocking basement, painting the basement, upgrade of walk-in refrigerator, first floor bathroom flooring upgrade (If budget allows), and an Elkay bottle filler for the dining room.
Related Buildings / Sites
Project Manager