Skip to main content
Access to material may be restricted.
SPH1 main electric panel
Access to material may be restricted.

SPH1 main electric panel

Project NumberSPH 2022-0222
CAPS Activity Code005574
Project DescriptionThis project will replace the existing main electrical switchgear with new. This requires a new exterior duct bank due to limited pathways in the building.Related Buildings / Sites
Engineer Bala | TMP
Project Manager John Boucher