Enterprise Research Campus phase1 interim drainage solution
Access to material may be restricted.

Enterprise Research Campus phase1 interim drainage solution

Project NumberALSP 2022-0179
CAPS Activity Code046212
Project DescriptionThe Interim Drain Solution is a temporary stormwater discharge alternative to the NASDEP to enable phase A of the Enterprise Research Campus development in Allston. This includes an Attenuation Storage Facility to provide sufficient discharge and attenuation capacity such that the ERC phase A development area does not
experience flooding during the design storm; and the existing drainage system to which the IDS connects is not adversely impacted.