Project DescriptionThe Interim Drain Solution is a temporary stormwater discharge alternative to the NASDEP to enable phase A of the Enterprise Research Campus development in Allston. This includes an Attenuation Storage Facility to provide sufficient discharge and attenuation capacity such that the ERC phase A development area does notexperience flooding during the design storm; and the existing drainage system to which the IDS connects is not adversely impacted.