Pusey replace ATS and elevator electrical distribution
Project NumberFHCL 2022-0231
Project TypeCapital Level Project
CAPS Activity Code012963
Project DescriptionThis project will replace the Automatic Transfer Switch (ATS) along with a normal/standby elevator and library power distribution system located in the Pusey north mechanical room.Related Buildings / SitesEngineer
RFS Engineering
Project Manager
Stavroula Birmbas