Blackstone Steam Plant mobile standby generator connection
Project NumberUOS 2023-0166
Project TypeCapital Level Project
CAPS Activity Code002820
Project DescriptionInstall equipment, cable work, and modify existing electrical systems to provide a means for electrical connection of a mobile generator at the Blackstone steam plant and load bank testing of the existing stationary Blackstone standby generator.Related Buildings / Sites