Doubletree Hotel - hot water boiler heat exchanger renewal project FY22
Project NumberHRES 2022-0136
Project TypeCapital Level Project
CAPS Activity Code023120
Project DescriptionHot water heat exchanger and boiler for the 5th-16th floors. Both boiler and heat exchangers have no back up therefore the contract proposal is to furnish and install two indirect domestic hot water heat exchangers in the area to the right of the UNILUX boiler. The installation will be complete and include the following labor, materials and equipment.Related Buildings / Sites
Engineer
George T. Wilkinson, Inc.