100 Holton Street electrical upgrades
Project NumberHRES 2011-0145
Project TypeCapital Level Project
CAPS Activity Code023026
Project DescriptionThe project will disconnect and remove the existing electrical service, main disconnect switch and main electrical distribution panel and cables and replace them with a new larger capacity electrical service and distribution panel to provide for existing and future renovations and expansion of the building. This project will also replace the old feeder cables with new plastic insulated conductors as the existing feeder cables are of the old cloth type and will provide proper working clearance in front of the new panel as needed and required for code compliance.Related Buildings / Sites