Skip to main content
Access to material may be restricted.
Schlesinger Library 3rd and 4th floor renovation
Access to material may be restricted.

Schlesinger Library 3rd and 4th floor renovation

Project NumberRAD 2013-0207
CAPS Activity Code007462
Project DescriptionThe Schlesinger Library book collection has been relocated to other storage areas on campus and at the Depository, opening desirable third floor work space. This project will repurpose the third floor space as much-needed flexible collections processing space.Related Buildings / Sites