Semitic Museum 3rd floor air conditioning
Project NumberFMUS 2014-0238
Project TypeCapital Level Project
CAPS Activity Code012539
Project DescriptionFabricate and install ducted HVAC system that services 3rd floor and main stairwell. Includes installing cooling lines to the 2nd floor existing storage which will be converted into a future seminar room.Related Buildings / Sites