Skip to main content
Access to material may be restricted.
Faculty Rubinstein new hire wet lab fit out phase 2
Access to material may be restricted.

Faculty Rubinstein new hire wet lab fit out phase 2

Project NumberSEAS 2014-0137
CAPS Activity Code008739
Project DescriptionThe purpose of this project is to provide BL2 lab space to enable research by SEAS Faculty new hire. This project will upgrade shared wet lab space in room 417 and convert the existing polisher equipment room 417 into BL2 wet lab space. The project construction scope will include, fume hood replacment, upgrades of local HVAC system, minor electrical branch power changes, lighting upgrade. Architectural work includes modification of laboratory casework and modification to entry door to lab. New lab equipment will include a glass washer, bio safety hood, and water purification unit.Related Buildings / Sites