Biology HVAC [heating, ventilation, and air conditioning] system replacement, phase 3
Project NumberFCOR 2019-0143
Project TypeCapital Level Project
CAPS Activity Code011025
Project DescriptionThis project is the final phase of the HVAC renewalRelated Buildings / Sites
Architect
Perkins + Will
Engineer
Rist-Frost-Shumway Engineering, P.C.
Associated
Shawmut Design and Construction