Biological Laboratory heating ventilation air conditioning system replacement, phase II
Project NumberFCOR 2018-0189
Project TypeCapital Level Project
CAPS Activity Code011016
Project DescriptionProject being submitted in 3 phases. Scope includes new structural steel and 3 high-velocity exhaust fans on the south side of the roof, new horizontal supplyand exhaust ductwork on the north wing roof and south side of the mechanical room, and connections to existing lab duct risers.
Related Buildings / Sites
Architect
Perkins + Will
Engineer
Rist-Frost-Shumway Engineering, P.C.
Associated
Shawmut Design and Construction