Object Number984_0016
TitlePlan showing metal clad switch gear for Harvard College substation addition
Date06/12/1930
Building/Site(s):
Text EntriesFirst floor plan -- Second floor plan -- Section 'A-A'
Project NumberPIRC 1930-023
Project NameHolyoke Place Substation addition
Sheet Number2
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionGood
DimensionsOverall: 22 1/2 × 36 in. (57.2 × 91.4 cm)
MediumBlueprint
Support / MaterialPaper
Extent
1 drawing
Scale
1/4 in. : 1 ft.
Object Number: 984_0015
Date: 05/19/1930
Project Number: PIRC 1930-023
Sites:
Holyoke Place Substation
Project Name: Holyoke Place Substation addition
Title:
Switch House site plan
Object Number: 984_0002
Date: 07/14/1926
Project Number: PIRC 1926-022
Sites:
Holyoke Place Substation
Project Name: Holyoke Place Substation original construction
Object Number: 984_0001
Date: 07/19/1926
Project Number: PIRC 1926-022
Sites:
Holyoke Place Substation
Project Name: Holyoke Place Substation original construction
Object Number: 984_0007
Date: 07/01/1926
Project Number: PIRC 1926-022
Sites:
Holyoke Place Substation
Project Name: Holyoke Place Substation original construction
Object Number: 984_0004
Date: 07/13/1926
Project Number: PIRC 1926-022
Sites:
Holyoke Place Substation
Project Name: Holyoke Place Substation original construction
Object Number: 984_0005
Date: 07/10/1926
Project Number: PIRC 1926-022
Sites:
Holyoke Place Substation
Project Name: Holyoke Place Substation original construction
Object Number: 984_0006
Date: [07/10/1926]
Project Number: PIRC 1926-022
Sites:
Holyoke Place Substation
Project Name: Holyoke Place Substation original construction
Object Number: 984_0030
Date: 01/30/1985
Project Number: PIRC 1984-037
Sites:
Dunster House
Project Name: 15KV distribution system
Object Number: EM.0049
Date: 12/14/2015
Project Number: UOS 2011-0171
Sites:
Holyoke Place Substation
Project Name: Upgrade 550V in steam tunnel
Object Number: P.984.0001
Date: 05/16/2007
Sites:
Holyoke Place Substation
Object Number: P.984.0002
Date: 09/24/2015
Sites:
Holyoke Place Substation
Title:
Plot plan, ramp details
Object Number: 984_0010
Date: 05/31/1930
Project Number: PIRC 1930-023
Sites:
Holyoke Place Substation
Project Name: Holyoke Place Substation addition