Object Number313C_1102
TitleSprinkler layout plans
Date02/10/2015
Firm
Jensen Hughes, Inc.
Building/Site(s):
Text Entries[Sprinkler plan] -- Symbol list -- General notes -- Fire alarm system symbols and legend
Project NumberFCOR 2016-0239
Project NameMallinckrodt basement sprinklers 2016
Sheet NumberFP-100
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionGood
DimensionsOverall: 24 × 36 in. (61 × 91.4 cm)
MediumBlackline print
Support / MaterialPaper
Extent
1 drawing
Scale
3/16 in. : 1 ft.
Title:
Attic sprinkler layout
Object Number: 313C_6071
Date: 06/23/2011
Project Number: FCOR 2011-0091
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: Mallinckrodt Chemistry Labs install fire sprinklers
Object Number: 313C_6070
Date: 04/17/2009
Project Number: FCOR 2009-0087
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: Mallinckrodt Chemistry Laboratory second floor sprinklers
Title:
[Sprinkler plan]
Object Number: 313C_5428
Date: 08/13/1998
Project Number: FAS 1997-009
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: First and third floor renovations
Title:
[Sprinkler plan]
Object Number: 313C_5429
Date: 08/13/1998
Project Number: FAS 1997-009
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: First and third floor renovations
Object Number: 313C_1094
Date: 07/10/2015
Project Number: FCOR 2015-0195
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: Betley Laboratory expansion, third floor
Object Number: PD.0100.001
Date: 2016
Project Number: FCOR 2016-0239
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: Mallinckrodt basement sprinklers 2016
Object Number: PD.0691.001
Date: 2010
Project Number: FCOR 2009-0087
Sites:
Bauer Laboratory (Life Sciences Building)
Project Name: Mallinckrodt Chemistry Laboratory second floor sprinklers
Object Number: PD.0727.001
Date: 2011
Project Number: FCOR 2011-0091
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: Mallinckrodt Chemistry Labs install fire sprinklers
Object Number: 313C_0790
Date: 02/05/1976
Project Number: FAS 1975-001
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: Renovations phase 3
Object Number: 313C_0773
Date: 06/16/1976
Project Number: FAS 1975-001
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: Renovations phase 3
Object Number: 313C_0719
Date: 04/25/1973
Project Number: FAS 1973-004
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: Renovation phase 1
Object Number: 313C_0797
Date: 04/11/1978
Project Number: PIRC 1978-006
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: Emergency generator
