Object Number2019.04.03.01
TitleConverse Chemistry Laboratory, Chemistry and Chemical Biology Professor Mason laboratory renewal: CAPS project close-out materials
DescriptionMaterials for this project have been received by the PIRC and are not yet fully cataloged, but may be made available to patrons upon request. Please contact PIRC staff for more information.Date05/23/2018
Firm
Ellenzweig
Building/Site(s):
Project NumberFCOR 2018-0003
Project NameConverse Chemisitry Laboratory, Chemistry and Chemical Biology Professor Mason laboratory renewal
Consultants Project Number31701.00
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
MediumBlackline print
Support / MaterialPaper
Extent
80 drawings
Object Number: PD.1096.002
Date: 5/23/2018
Project Number: FCOR 2018-0003
Sites:
Converse Chemistry Laboratory
Project Name: Converse Chemistry Laboratory, Chemistry and Chemical Biology Professor Mason laboratory renewal
Object Number: PD.1096.001
Date: 5/23/2018
Project Number: FCOR 2018-0003
Sites:
Converse Chemistry Laboratory
Project Name: Converse Chemistry Laboratory, Chemistry and Chemical Biology Professor Mason laboratory renewal
Object Number: PD.1096.003
Date: 2017-2018
Project Number: FCOR 2018-0003
Sites:
Converse Chemistry Laboratory
Project Name: Converse Chemistry Laboratory, Chemistry and Chemical Biology Professor Mason laboratory renewal
Object Number: PD.0730.001
Date: 2011
Project Number: FCOR 2011-0219
Sites:
Mallinckrodt Chemistry Laboratory
Project Name: Mallinckrodt Chemistry Laboratory third floor Balskus Laboratory Department of Chemistry and Chemical Biology
Object Number: 2024.06.25.02
Date: 2024
Project Number: FCOR 2024-0172
Sites:
Northwest Building
Project Name: NW Professor Garner lounge 441 renewal
Object Number: 2014.03.14.01
Date: 2013
Project Number: SEAS 2013-0030
Sites:
Northwest Building
Project Name: Northwest Building Aizenberg laboratory fit-out
Object Number: 2009.11.23.01
Date: 2008
Project Number: FCOR 2008-0416
Sites:
Northwest Building
Project Name: Northwest Labs floor four north systems biology phase 2
Object Number: 2021.11.15.01
Date: 2019
Project Number: FCOR 2019-0143
Sites:
Biological Laboratory
Project Name: Biology HVAC [heating, ventilation, and air conditioning] system replacement, phase 3
Object Number: 2009.11.23.03
Date: 12/30/2008
Project Number: FCOR 2008-0553
Sites:
Northwest Building
Project Name: NWL Needleman animal holding level 3
Object Number: 2009.11.23.02
Date: 12/30/2008
Project Number: FCOR 2008-0420
Sites:
Northwest Building
Project Name: NWL Fl. B4 Neurotechnology Core
Object Number: 2017.03.30.01
Date: 2016
Project Number: HBS 2015-0232
Sites:
Pagliuca Harvard Life Lab
Project Name: Harvard Innovation Life Laboratory construction
Object Number: 2024.05.17.06
Date: 2022
Project Number: FCOR 2022-0265
Sites:
69 Dunster Street
Project Name: 69 Dunster Street renewal