Object Number311_2316
TitleLevel 05 fire protection demolition plan
Date12/11/2017
Additional Firm
Rist-Frost-Shumway Engineering, P.C.
Additional Firm
Perkins + Will
Building/Site(s):
Text Entries1. Level 05 - fire protection demolition plan
Project NameBiological Laboratory, fifth floor north wing renewal for FlyBase
Project NumberFCOR 2017-0037
Sheet NumberFP04-01
Consultants Project Number155303.000
CollectionArchitectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
Extent1 drawing
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPaper
ScaleAs noted
Object Number: 311_3614
Date: 06/25/2019
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory
Object Number: 311_2317
Date: 12/11/2017
Project Number: FCOR 2017-0037
Sites: Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Title: Level 05 - demolition plan
Object Number: 311_3581
Date: 05/01/2019
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory
Object Number: 311_3617
Date: [03/01/2019]
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory
Object Number: 311_2329
Date: 08/16/2017
Project Number: FCOR 2017-0037
Sites: Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Object Number: 311_2330
Date: 08/16/2017
Project Number: FCOR 2017-0037
Sites: Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Object Number: 311_2319
Date: [01/01/2017]
Project Number: FCOR 2017-0037
Sites: Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Object Number: 311_2331
Date: 08/16/2017
Project Number: FCOR 2017-0037
Sites: Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Object Number: 311_3608
Date: 06/25/2019
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory
Object Number: 311_2234
Date: [01/01/2017]
Project Number: FCOR 2017-0039
Sites: Biological Laboratory
Project Name: Biological Laboratory, relocation of Professor Cavanaugh laboratory (heating ventilation air conditioning enabling)
Object Number: 311_2631
Date: 05/20/2016
Project Number: FCOR 2016-0045
Sites: Biological Laboratory
Project Name: Hoekstra Laboratory renovation
Object Number: 311_3610
Date: 06/12/2019
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory