Object Number311_2401
TitleSecond floor demolition plan
Date[07/24/2015]
Firm
Perkins + Will
Additional Firm
Rist-Frost-Shumway Engineering, P.C.
Additional Firm
R.W. Sullivan Engineering
Building/Site(s):
Project NumberFCOR 2015-0137
Project NameDepartment of Organismic and Evolutionary Biology, professor Cassandra Extavour Laboratory expansion
Sheet NumberA05-01
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPaper
Extent
1 drawing
Scale
As noted
Object Number: 311_7414
Date: 11/15/1996
Project Number: FAS 1997-013
Sites:
Biological Laboratory
Project Name: Lab renovations, Professor Palumbi, Bio Labs
Title:
Second floor demolition plan
Object Number: 311_7581
Date: 07/09/1999
Project Number: FAS 2000-001
Sites:
Biological Laboratory
Project Name: Professor Branton lab renovation
Object Number: 311_6527
Date: [01/01/2009]
Project Number: FCOR 2009-0125
Sites:
Biological Laboratory
Project Name: Biolabs: Professor B. Burton Lab renovation
Object Number: 311_6561
Date: [01/22/2009]
Project Number: FCOR 2009-0126
Sites:
Biological Laboratory
Project Name: Biolabs: Professor S. Mango Lab renovation project
Object Number: 311_6687
Date: [11/09/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6641
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6640
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6673
Date: [01/22/2010]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Title:
Second floor demolition plan
Object Number: 311_6628
Date: 12/23/2009
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6689
Date: 11/09/2009
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6674
Date: [01/22/2010]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6657
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
