Object Number311_2443
TitleMechanical details
Date[07/24/2015]
Additional Firm
Perkins + Will
Additional Firm
R.W. Sullivan Engineering
Building/Site(s):
Text EntriesTypical duct branch take-offs -- Fire damper detail -- Typical multiple active chilled beam coil piping detail for same length modules -- Active chilled beam coil piping detail #1 -- Active chilled beam coil piping detail #2 -- Plenum air terminal connection detail -- VAV / CV box detail -- Rectangle ductwork support detail -- Pipe support details -- Typical fan coil unit chilled water coil piping detail -- Finned tube radiation and radiant panel piping detail -- Secondary chilled water piping schematic -- Round ductwork support detail
Project NumberFCOR 2015-0137
Project NameDepartment of Organismic and Evolutionary Biology, professor Cassandra Extavour Laboratory expansion
Sheet NumberM04-01
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPaper
Extent
1 drawing
Scale
As noted
Title:
Mechanical details
Object Number: 311_6595
Date: 04/08/2009
Project Number: FCOR 2009-0176
Sites:
Biological Laboratory
Project Name: Biolabs Growth Chambers phase 1
Title:
Mechanical details
Object Number: 311_6466
Date: 02/25/2009
Project Number: FCOR 2009-0104
Sites:
Biological Laboratory
Project Name: Biolabs: OEB Growth Chamber Infrastructure
Title:
Mechanical details
Object Number: 311_6680
Date: [11/09/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6536
Date: [01/01/2009]
Project Number: FCOR 2009-0125
Sites:
Biological Laboratory
Project Name: Biolabs: Professor B. Burton Lab renovation
Title:
Mechanical details
Object Number: 311_6645
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6652
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6691
Date: [11/09/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6570
Date: 04/09/2009
Project Number: FCOR 2009-0126
Sites:
Biological Laboratory
Project Name: Biolabs: Professor S. Mango Lab renovation project
Object Number: 311_6731
Date: 08/26/2009
Project Number: FCOR 2010-0021
Sites:
Biological Laboratory
Project Name: SCRB Program: Molecular and Cellular Biology [MCB] laboratories and offices
Object Number: 311_6903
Date: 02/01/2010
Project Number: FCOR 2010-0021
Sites:
Biological Laboratory
Project Name: SCRB Program: Molecular and Cellular Biology [MCB] laboratories and offices
Object Number: 311_6524
Date: [01/01/2009]
Project Number: FCOR 2009-0125
Sites:
Biological Laboratory
Project Name: Biolabs: Professor B. Burton Lab renovation
Object Number: 311_6558
Date: [01/22/2009]
Project Number: FCOR 2009-0126
Sites:
Biological Laboratory
Project Name: Biolabs: Professor S. Mango Lab renovation project
