Skip to main content
Fire protection details
Media Restricted

Object Number311_2527

TitleFire protection details
Date04/22/2015
Building/Site(s):
Text Entries
1. Clevis-band hanger & rod installation detail and schedule -- 2. Installation requirement for sprinkler locations at walls -- 3. Location of sprinkler at acoustical ceiling tiles -- 4. Typical recessed sprinkler return bend drop -- 5. Single pipe seismic bracing diagram -- 6. Longitudinal seismic bracing diagram -- 7. Four way longitudinal seismic bracing diagram -- 8. Lateral seismic bracing diagram -- 9. Surge restrainer diagram --10. Sprinkler coverage in congested open ceiling areas
Project NumberFCOR 2015-0089
Project NameMCB senior appointment - Sean Eddy
Sheet NumberF2.0
Consultants Project NumberB1500420.000
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 36 × 48 in. (91.4 × 121.9 cm)
MediumBlackline print
Support / MaterialPaper
Extent 1 drawing
Scale NTS
Object Number: 311_6354
Date: 05/27/2006
Project Number: FAS 2006-008
Sites: Biological Laboratory
Project Name: Schier Laboratory, in the Bio-Labs
Object Number: 311_6785
Date: 09/11/2009
Project Number: FCOR 2010-0021
Sites: Biological Laboratory
Project Name: SCRB Program: Molecular and Cellular Biology [MCB] laboratories and offices
Object Number: 311_6870
Date: 02/01/2010
Project Number: FCOR 2010-0021
Sites: Biological Laboratory
Project Name: SCRB Program: Molecular and Cellular Biology [MCB] laboratories and offices
Object Number: 311_6896
Date: 02/01/2010
Project Number: FCOR 2010-0021
Sites: Biological Laboratory
Project Name: SCRB Program: Molecular and Cellular Biology [MCB] laboratories and offices
Object Number: 311_6937
Date: 02/22/2010
Project Number: FCOR 2010-0021
Sites: Biological Laboratory
Project Name: SCRB Program: Molecular and Cellular Biology [MCB] laboratories and offices
Object Number: 311_6411
Date: 08/08/2008
Project Number: FCOR 2008-0351
Sites: Biological Laboratory
Project Name: Kramer Lab renovation
Object Number: 311_6703
Date: [11/09/2009]
Project Number: FCOR 2010-0009
Sites: Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6659
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites: Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6564
Date: [01/22/2009]
Project Number: FCOR 2009-0126
Sites: Biological Laboratory
Project Name: Biolabs: Professor S. Mango Lab renovation project
Object Number: 311_2226
Date: [01/01/2017]
Project Number: FCOR 2017-0039
Sites: Biological Laboratory
Project Name: Biological Laboratory, relocation of Professor Cavanaugh laboratory (heating ventilation air conditioning enabling)
Object Number: 311_2523
Date: 04/22/2015
Project Number: FCOR 2015-0089
Sites: Biological Laboratory
Project Name: MCB senior appointment - Sean Eddy
Object Number: 311_3514
Date: 01/17/2019
Project Number: FCOR 2019-0030
Sites: Biological Laboratory
Project Name: Biological Laboratory, Bellono Lab renewal