Object Number960A_1407
TitleGore complex typical waterproofing details
Date08/25/2017
Firm
Beyer Blinder Belle
Building/Site(s):
Text EntriesA. Typical fluid-applied to integral waterproofing transition -- B. Typical integral waterproofing end lap detail for wall or slab -- C. Typical integral waterproofing control and construction join -- D. Typical integral waterproofing top termination and end lap -- E. Typical integral waterproofing preformed inside corner -- F. Typical integral waterproofing prefrmed outside corner -- G. Typical integral waterproofing preformed corner inside cap -- H. Typical integral waterproofing preformed conrer outside cap -- J. Typical integral waterproofing at footing inside corner -- K. Typical integral waterproofing termination between existing / new structure and new topping slab -- L. Typical fluid applied waterproofing flashing of penetrations -- M. Typical integral waterproofing to self-adhered waterproofing tie-in at below grade inside corner -- N. Typical integral waterproofing between existing / new structure and new topping slab 2 -- P. Typical outside corner transition from integral waterproofing to fluid applied waterproofing -- Q. Typical waterproofing of new cored penetration through existing basement exterior wall, above 16'-0" -- R. Typical waterproofing of penetration through new floor slab and topping slab
Project NameWinthrop House renovation
Project NumberFCOL 2013-0144
Consultants Project Number2434
Sheet NumberFR6.50
CollectionArchitectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
Extent1 drawing
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPaper
ScaleAs indicated
Object Number: 960A_1409
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House
Project Name: Winthrop House renovation
Object Number: 960A_1408
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House - Gore Hall
Project Name: Winthrop House renovation
Object Number: 960A_1389
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House - Gore Hall
Project Name: Winthrop House renovation
Title: Gore waterproofing details
Object Number: 960A_1432
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House - Gore Hall
Project Name: Winthrop House renovation
Title: Gore waterproofing details
Object Number: 960A_1433
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House - Gore Hall
Project Name: Winthrop House renovation
Title: Gore waterproofing details
Object Number: 960A_1434
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House
Project Name: Winthrop House renovation
Object Number: 960A_1001
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House - Gore Hall
Project Name: Winthrop House renovation
Object Number: 960A_1002
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House
Project Name: Winthrop House renovation
Title: Gore Hall complex site plan
Object Number: 960A_1012
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House - Gore Hall
Project Name: Winthrop House renovation
Object Number: 960A_1011
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House
Project Name: Winthrop House renovation
Object Number: 960A_1013
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House
Project Name: Winthrop House renovation
Object Number: 960A_1016
Date: 08/25/2017
Project Number: FCOL 2013-0144
Sites: Winthrop House
Project Name: Winthrop House renovation