Skip to main content
Electrical details
Media Restricted

Object Number311_3543

TitleElectrical details
Date01/17/2019
Building/Site(s):
Text Entries
1. Typical device locations -- 2. Acceptable device box mounting location -- 3. Partial basement one-line diagram -- 4. Partial electrical closet number two one-line diagram -- 5. Typical bench raceway device layout -- 6. Emergency lighting transfer device for switched lighting loads wiring diagram
Project NumberFCOR 2019-0030
Project NameBiological Laboratory, Bellono Lab renewal
Sheet NumberE40-00
Consultants Project Number155075.007
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPaper
Extent 1 drawing
Scale As noted
Object Number: 311_1400
Date: 05/04/1976
Project Number: FAS 1976-027
Sites: Biological Laboratory
Project Name: Update existing wire shafts 5 and 6
Object Number: 311_5275
Date: 11/10/1975
Project Number: FAS 1976-006
Sites: Biological Laboratory
Project Name: Alterations to rooms B542A, 542B, 544, 548, 548B for Dr. Sato
Object Number: 311_7428
Date: 01/13/1997
Project Number: FAS 1997-013
Sites: Biological Laboratory
Project Name: Lab renovations, Professor Palumbi, Bio Labs
Object Number: 311_6284
Date: 04/08/2005
Project Number: FAS 2005-051
Sites: Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6279
Date: 04/08/2005
Project Number: FAS 2005-051
Sites: Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6285
Date: 04/08/2005
Project Number: FAS 2005-051
Sites: Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6301
Date: 01/21/2005
Project Number: FAS 2005-051
Sites: Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6371
Date: 06/03/2005
Project Number: FAS 2006-008
Sites: Biological Laboratory
Project Name: Schier Laboratory, in the Bio-Labs
Object Number: 311_6626
Date: 04/10/2009
Project Number: FCOR 2009-0256
Sites: Biological Laboratory
Project Name: Biolabs emergency power phase 3B
Object Number: 311_6429
Date: 08/08/2008
Project Number: FCOR 2008-0351
Sites: Biological Laboratory
Project Name: Kramer Lab renovation
Object Number: 311_6366
Date: 07/20/2005
Project Number: FAS 2006-008
Sites: Biological Laboratory
Project Name: Schier Laboratory, in the Bio-Labs
Object Number: 311_6605
Date: 04/08/2009
Project Number: FCOR 2009-0176
Sites: Biological Laboratory
Project Name: Biolabs Growth Chambers phase 1