Object Number311_3586
TitleLevel 05 - enlarged lab plan and elevations
Date03/01/2019
Firm
Perkins + Will
Additional Firm
Rist-Frost-Shumway Engineering, P.C.
Building/Site(s):
Project NameBiolabs Warinner Laboratory
Project NumberFCOR 2019-0141
Sheet NumberA16.05
CollectionArchitectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
Extent1 drawing
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPaper
Object Number: 311_3590
Date: 08/06/2019
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory
Object Number: 311_3588
Date: 04/01/2019
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory
Object Number: 311_3008
Date: 06/08/2018
Project Number: FCOR 2017-0206
Sites: Biological Laboratory
Project Name: Biological Laboratory, Molecular and Cellular Biology Professor Uchida laboratory, FY2018
Object Number: 311_2234
Date: [01/01/2017]
Project Number: FCOR 2017-0039
Sites: Biological Laboratory
Project Name: Biological Laboratory, relocation of Professor Cavanaugh laboratory (heating ventilation air conditioning enabling)
Object Number: 311_2631
Date: 05/20/2016
Project Number: FCOR 2016-0045
Sites: Biological Laboratory
Project Name: Hoekstra Laboratory renovation
Object Number: 311_3610
Date: 06/12/2019
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory
Object Number: 311_3614
Date: 06/25/2019
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory
Title: Level 05 - finish plan
Object Number: 311_2309
Date: 04/18/2018
Project Number: FCOR 2017-0037
Sites: Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Title: Level 05 - furniture plan
Object Number: 311_2310
Date: 04/18/2018
Project Number: FCOR 2017-0037
Sites: Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Object Number: 311_2307
Date: 04/23/2018
Project Number: FCOR 2017-0037
Sites: Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Object Number: 311_3603
Date: [03/01/2019]
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory
Object Number: 311_3608
Date: 06/25/2019
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory