Object Number311_3612
TitleFire protection legend, notes and abbreviations
Date[03/01/2019]
Firm
Perkins + Will
Additional Firm
Rist-Frost-Shumway Engineering, P.C.
Building/Site(s):
Project NameBiolabs Warinner Laboratory
Project NumberFCOR 2019-0141
Sheet NumberFP00.00
CollectionArchitectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
Extent1 drawing
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPaper
Object Number: 311_6703
Date: [11/09/2009]
Project Number: FCOR 2010-0009
Sites: Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6855
Date: 10/09/2009
Project Number: FCOR 2010-0021
Sites: Biological Laboratory
Project Name: SCRB Program: Molecular and Cellular Biology [MCB] laboratories and offices
Object Number: 311_3015
Date: 04/16/2018
Project Number: FCOR 2017-0206
Sites: Biological Laboratory
Project Name: Biological Laboratory, Molecular and Cellular Biology Professor Uchida laboratory, FY2018
Object Number: 311_6530
Date: [01/01/2009]
Project Number: FCOR 2009-0125
Sites: Biological Laboratory
Project Name: Biolabs: Professor B. Burton Lab renovation
Object Number: 311_2226
Date: [01/01/2017]
Project Number: FCOR 2017-0039
Sites: Biological Laboratory
Project Name: Biological Laboratory, relocation of Professor Cavanaugh laboratory (heating ventilation air conditioning enabling)
Object Number: 311_2615
Date: [01/01/2017]
Project Number: FCOR 2016-0045
Sites: Biological Laboratory
Project Name: Hoekstra Laboratory renovation
Object Number: 311_1663
Date: 02/17/2012
Project Number: FCOR 2011-0245
Sites: Biological Laboratory
Project Name: Biological Laboratory growth chamber phase 2
Object Number: 311_6659
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites: Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_1873
Date: 09/23/2011
Project Number: FCOR 2012-0046
Sites: Biological Laboratory
Project Name: Biological Laboratory [OEB] professor in residence
Object Number: 311_2315
Date: [01/01/2017]
Project Number: FCOR 2017-0037
Sites: Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Object Number: 311_3514
Date: 01/17/2019
Project Number: FCOR 2019-0030
Sites: Biological Laboratory
Project Name: Biological Laboratory, Bellono Lab renewal
Object Number: 311_6564
Date: [01/22/2009]
Project Number: FCOR 2009-0126
Sites: Biological Laboratory
Project Name: Biolabs: Professor S. Mango Lab renovation project