Object Number311_5345
TitleKitchen equipment and HVAC food service equipment schedule
Date03/20/1991
Building/Site(s):
Project NumberFAS 1990-039
Project NameCafe - first floor south
Sheet NumberFS1
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionFair
DimensionsOverall: 24 x 36 in. (61 x 91.4 cm)
MediumDiazotype
Support / MaterialPaper
Object Number: 311_5346
Date: 03/20/1991
Project Number: FAS 1990-039
Sites:
Biological Laboratory
Project Name: Cafe - first floor south
Object Number: 311_5355
Date: 03/20/1991
Project Number: FAS 1990-039
Sites:
Biological Laboratory
Project Name: Cafe - first floor south
Object Number: 311_6536
Date: [01/01/2009]
Project Number: FCOR 2009-0125
Sites:
Biological Laboratory
Project Name: Biolabs: Professor B. Burton Lab renovation
Object Number: 311_6570
Date: 04/09/2009
Project Number: FCOR 2009-0126
Sites:
Biological Laboratory
Project Name: Biolabs: Professor S. Mango Lab renovation project
Object Number: 311_6652
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6691
Date: [11/09/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_2225
Date: [01/01/2017]
Project Number: FCOR 2017-0039
Sites:
Biological Laboratory
Project Name: Biological Laboratory, relocation of Professor Cavanaugh laboratory (heating ventilation air conditioning enabling)
Object Number: 04560_1023
Date: 09/14/2008
Project Number: FAS 2004-016
Sites:
Northwest Building
Project Name: Northwest building [original construction of North West Labs, NWL
Object Number: 311_5155
Date: 03/04/1983
Project Number: FAS 1980-070
Sites:
Biological Laboratory
Project Name: Modernization phase A and B
Title:
Equipment schedule
Object Number: 311_6338
Date: 09/05/2006
Project Number: FAS 2006-008
Sites:
Biological Laboratory
Project Name: Schier Laboratory, in the Bio-Labs
Object Number: 311_6551
Date: 05/19/2009
Project Number: FCOR 2009-0126
Sites:
Biological Laboratory
Project Name: Biolabs: Professor S. Mango Lab renovation project
Object Number: 311_6490
Date: 10/08/2008
Project Number: FCOR 2009-0108
Sites:
Biological Laboratory
Project Name: Biolabs: Professor V. Murthy Lab renovation