Object Number311_6501
TitleDuctwork
Date11/28/2008
Additional Firm
J.C. Higgins Corp.
Firm
Excel HVAC, Inc.
Building/Site(s):
Project NumberFCOR 2009-0108
Project NameBiolabs: Professor V. Murthy Lab renovation
Sheet NumberM-300
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 36 x 55 in. (91.4 x 139.7 cm)
MediumBlackline print
Support / MaterialPolyester film
Extent
1 drawing
Scale
3/8 in. : 1 ft.
Object Number: 311_1437
Date: 04/10/1980
Project Number: FAS 1977-020
Sites:
Biological Laboratory
Project Name: Renovations and alterations to existing third floor (Doctors Losick & Hubbard)
Object Number: 311_1446
Date: 03/13/1979
Project Number: FAS 1977-020
Sites:
Biological Laboratory
Project Name: Renovations and alterations to existing third floor (Doctors Losick & Hubbard)
Title:
Layout of ductwork
Object Number: 311_1477
Date: 04/28/1980
Project Number: FAS 1981-005
Sites:
Biological Laboratory
Project Name: Vent stack enclosures phase 1
Title:
Layout of ductwork
Object Number: 311_1476
Date: 04/28/1980
Project Number: FAS 1981-005
Sites:
Biological Laboratory
Project Name: Vent stack enclosures phase 1
Title:
Losick HVAC ductwork plan
Object Number: 311_1435
Date: 04/10/1980
Project Number: FAS 1977-020
Sites:
Biological Laboratory
Project Name: Renovations and alterations to existing third floor (Doctors Losick & Hubbard)
Object Number: 311_6272
Date: 02/11/2005
Project Number: FAS 2005-051
Sites:
Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6360
Date: 05/06/2005
Project Number: FAS 2006-008
Sites:
Biological Laboratory
Project Name: Schier Laboratory, in the Bio-Labs
Object Number: 311_7631
Date: 07/15/2008
Project Number: FCOR 2007-0168
Sites:
Biological Laboratory
Project Name: Abzhanov Lab renovation
Object Number: 311_6296
Date: 04/20/2005
Project Number: FAS 2005-051
Sites:
Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6642
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6729
Date: 08/26/2009
Project Number: FCOR 2010-0021
Sites:
Biological Laboratory
Project Name: SCRB Program: Molecular and Cellular Biology [MCB] laboratories and offices
Object Number: 311_6730
Date: 08/26/2009
Project Number: FCOR 2010-0021
Sites:
Biological Laboratory
Project Name: SCRB Program: Molecular and Cellular Biology [MCB] laboratories and offices
