Object Number311_6693
TitleSecond floor electrical lighting plan & lighting fixture schedule
Date11/09/2009
Additional Firm
Rist-Frost-Shumway Engineering, P.C.
Firm
Perkins + Will
Building/Site(s):
Project NumberFCOR 2010-0009
Project NameBiolabs: Professor Engert lab suite renovation
Sheet NumberE-401
Collection
Architectural & Technical Drawings
Notes"Imaging core facility renovation"
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 30 x 42 in. (76.2 x 106.7 cm)
MediumBlackline print
Support / MaterialPolyester film
Extent
1 drawing
Scale
1/4 in. : 1 ft.
Object Number: 311_1701
Date: 08/23/2012
Project Number: FCOR 2011-0245
Sites:
Biological Laboratory
Project Name: Biological Laboratory growth chamber phase 2
Object Number: 311_1690
Date: 02/17/2012
Project Number: FCOR 2011-0245
Sites:
Biological Laboratory
Project Name: Biological Laboratory growth chamber phase 2
Object Number: 311_1960
Date: 09/19/2015
Project Number: FCOR 2014-0261
Sites:
Biological Laboratory
Project Name: Girguis Laboratory in the Biological Laboratories
Object Number: 311_2336
Date: 08/16/2017
Project Number: FCOR 2017-0037
Sites:
Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Object Number: 311_2244
Date: 02/01/2017
Project Number: FCOR 2017-0039
Sites:
Biological Laboratory
Project Name: Biological Laboratory, relocation of Professor Cavanaugh laboratory (heating ventilation air conditioning enabling)
Object Number: 311_2461
Date: [07/24/2015]
Project Number: FCOR 2015-0137
Sites:
Biological Laboratory
Project Name: Department of Organismic and Evolutionary Biology, professor Cassandra Extavour Laboratory expansion
Object Number: 311_2656
Date: 10/10/2016
Project Number: FCOR 2016-0045
Sites:
Biological Laboratory
Project Name: Hoekstra Laboratory renovation
Object Number: 311_2657
Date: [01/01/2017]
Project Number: FCOR 2016-0045
Sites:
Biological Laboratory
Project Name: Hoekstra Laboratory renovation
Title:
Lighting fixture
Object Number: 311_0742
Date: 03/22/1947
Project Number: PIRC 1946-005
Sites:
Biological Laboratory
Project Name: North wing renovations
Title:
Lighting fixture
Object Number: 311_0753
Date: 05/12/1947
Project Number: PIRC 1947-004
Sites:
Biological Laboratory
Project Name: Renovations
Object Number: 311_6536
Date: [01/01/2009]
Project Number: FCOR 2009-0125
Sites:
Biological Laboratory
Project Name: Biolabs: Professor B. Burton Lab renovation
Object Number: 311_6652
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation