Object Number04481_0139
TitleMicroscope suite room
Date03/15/2008
Additional Creator
Jose Rafael Moneo
Building/Site(s):
Text Entries[Elevations]
Project NumberFAS 1999-023
Project NameLaboratory for Integrated Science and Engineering (LISE) original construction
Sheet NumberA5.52
Collection
Architectural & Technical Drawings
NotesThe Laboratory for Interface Science and Engineering was later renamed the Laboratory for Integrated Science and Engineering.
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 30 x 42 in. (76.2 x 106.7 cm)
MediumBlackline print
Support / MaterialPolyester film
Extent
1 drawing
Scale
3/8 in. : 1 ft.
Title:
Microscope suite room
Object Number: 04481_0137
Date: 02/09/2007
Project Number: FAS 1999-023
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Title:
Microscope suite room
Object Number: 04481_0138
Date: 03/15/2008
Project Number: FAS 1999-023
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Title:
Microscope room details
Object Number: 04481_0288
Date: 03/15/2008
Project Number: FAS 1999-023
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Title:
Toilet room elevations
Object Number: 04481_0132
Date: 03/15/2008
Project Number: FAS 1999-023
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Title:
Shielded room
Object Number: 04481_0292
Date: 02/09/2007
Project Number: FAS 1999-023
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Title:
Shielded room experiment #4
Object Number: 04481_0771
Date: 11/02/2007
Project Number: FAS 2007-007
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Lise, Yacoby lab fit out
Title:
Room conditions part one
Object Number: 04481_0306
Date: 01/31/2005
Project Number: FAS 1999-023
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Title:
Room conditions part two
Object Number: 04481_0307
Date: 01/31/2005
Project Number: FAS 1999-023
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0354
Date: 01/31/2005
Project Number: FAS 1999-023
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0355
Date: 01/31/2005
Project Number: FAS 1999-023
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0356
Date: 01/31/2005
Project Number: FAS 1999-023
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0357
Date: 01/31/2005
Project Number: FAS 1999-023
Sites:
Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
