Object Number311_1237
TitleFourth floor electrical plan
Date01/09/1967
Building/Site(s):
Project NumberPIRC 1967-007
Project NameRemodeling job #6626 and #6627
Sheet Number4-1E
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionFair
DimensionsOverall: 24 x 32 in. (61 x 81.3 cm)
MediumDiazotype
Support / MaterialPaper
Title:
Fourth floor part plan
Object Number: 311_1118
Date: 09/03/1968
Project Number: PIRC 1968-003
Sites:
Biological Laboratory
Project Name: Alterations
Title:
Fourth floor contract
Object Number: 311_1246
Date: 01/09/1967
Project Number: PIRC 1967-007
Sites:
Biological Laboratory
Project Name: Remodeling job #6626 and #6627
Title:
Fourth floor contract
Object Number: 311_1241
Date: 01/09/1967
Project Number: PIRC 1967-007
Sites:
Biological Laboratory
Project Name: Remodeling job #6626 and #6627
Object Number: 311_7724
Date: 06/20/1997
Project Number: FAS 1997-012
Sites:
Biological Laboratory
Project Name: Lab renovations, Professor Cavanaugh, Bio Labs
Object Number: 311_7723
Date: 06/20/1997
Project Number: FAS 1997-012
Sites:
Biological Laboratory
Project Name: Lab renovations, Professor Cavanaugh, Bio Labs
Object Number: 311_7722
Date: 06/20/1997
Project Number: FAS 1997-012
Sites:
Biological Laboratory
Project Name: Lab renovations, Professor Cavanaugh, Bio Labs
Object Number: 311_1224
Date: 04/21/1967
Project Number: PIRC 1967-006
Sites:
Biological Laboratory
Project Name: Remodeling: Professors Bogorad, Briggs, and Torrey
Object Number: 311_1014
Date: 01/13/1961
Project Number: PIRC 1961-014
Sites:
Biological Laboratory
Project Name: Laboratory alterations for Dr. Griffin - fourth floor
Title:
Electrical fourth floor plan
Object Number: 311_6384
Date: 10/03/2008
Project Number: FCOR 2009-0049
Sites:
Biological Laboratory
Project Name: Biology Standby Generator (revised phase 3)
Object Number: 311_6491
Date: 10/21/2008
Project Number: FCOR 2009-0108
Sites:
Biological Laboratory
Project Name: Biolabs: Professor V. Murthy Lab renovation
Title:
Electrical fourth floor plan
Object Number: 311_6619
Date: 04/10/2009
Project Number: FCOR 2009-0256
Sites:
Biological Laboratory
Project Name: Biolabs emergency power phase 3B
Title:
Electrical fourth floor plan
Object Number: 311_6621
Date: 04/10/2009
Project Number: FCOR 2009-0256
Sites:
Biological Laboratory
Project Name: Biolabs emergency power phase 3B