Object Number04560_1520
TitleHVAC details
Date11/24/2009
Firm
BR+A
Building/Site(s):
Text EntriesTransfer duct details and schedule -- Supply box with coil and downstream sound attenuator -- Laboratory pressurization control system: supply air valve assembly installation detail -- Laboratory pressurization control system: general exhaust air valve assembly installation detail -- Laboratory pressurization control system: fume hood exhaust air valve assembly installation detail -- Return/exhaust box with upstream sound attenuator -- Manual air vent -- Automatic air vent -- In-duct terminal box rehead coil with central strainer -- Chilled water system piping for lab equipment
Project NumberFCOR 2010-0018
Project NameSCRB program: MCB laboratories and offices - NWL
Sheet NumberH5-1-2
Collection
Architectural & Technical Drawings
NotesLevel 3 Fit-out
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPolyester film
Extent
1 drawing
Scale
As noted
Title:
HVAC standard details
Object Number: 04560_1068
Date: 03/05/2009
Project Number: FCOR 2008-0382
Sites:
Northwest Building
Project Name: NWL Neuroimaging B4
Title:
HVAC details
Object Number: 04560_1165
Date: 03/04/2009
Project Number: FCOR 2008-0419
Sites:
Northwest Building
Project Name: Northwest Labs floor 3 north systembs biology phase 2
Object Number: 04560_1007
Date: 02/18/2009
Project Number: FAS 2004-016
Sites:
Northwest Building
Project Name: Northwest building [original construction of North West Labs, NWL
Title:
HVAC details
Object Number: 04560_1289
Date: 10/30/2009
Project Number: FCOR 2009-0016
Sites:
Northwest Building
Project Name: NWL Teaching Labs
Title:
HVAC details
Object Number: 04560_1377
Date: 03/25/2010
Project Number: FCOR 2009-0187
Sites:
Northwest Building
Project Name: Northwest Labs glasswash facility expansion, phase 2
Title:
HVAC standard details
Object Number: 04560_0522
Date: 08/08/2005
Project Number: FAS 2004-016
Sites:
Northwest Building
Project Name: Northwest building [original construction of North West Labs, NWL
Object Number: 04560_0524
Date: 02/23/2007
Project Number: FAS 2004-016
Sites:
Northwest Building
Project Name: Northwest building [original construction of North West Labs, NWL
Title:
HVAC details
Object Number: 04560_1164
Date: 03/04/2009
Project Number: FCOR 2008-0419
Sites:
Northwest Building
Project Name: Northwest Labs floor 3 north systembs biology phase 2
Title:
HVAC standard details
Object Number: 04560_0519
Date: 08/24/2006
Project Number: FAS 2004-016
Sites:
Northwest Building
Project Name: Northwest building [original construction of North West Labs, NWL
Title:
HVAC standard details
Object Number: 04560_1069
Date: 03/05/2009
Project Number: FCOR 2008-0382
Sites:
Northwest Building
Project Name: NWL Neuroimaging B4
Title:
HVAC standard details
Object Number: 04560_0520
Date: 08/08/2005
Project Number: FAS 2004-016
Sites:
Northwest Building
Project Name: Northwest building [original construction of North West Labs, NWL
Object Number: 04560_0856
Date: 12/30/2008
Project Number: FAS 2004-016
Sites:
Northwest Building
Project Name: Northwest building [original construction of North West Labs, NWL
