Skip to main content
LISE material synthesis south / backend horn / strobe layout, ground level
Media Restricted

Object Number04481_0352

TitleLISE material synthesis south / backend horn / strobe layout, ground level
Date01/31/2005
Additional Creator
Additional Firm
Building/Site(s):
Text Entries
[Horn and strobe layout plan] -- Life safety legend
Project NameLaboratory for Integrated Science and Engineering (LISE) original construction
Project NumberFAS 1999-023
Sheet NumberA10.02.91
NotesThe Laboratory for Interface Science and Engineering was later renamed the Laboratory for Integrated Science and Engineering.
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
Extent1 drawing
DimensionsOverall: 30 x 42 in. (76.2 x 106.7 cm)
MediumBlackline print
Support / MaterialPaper
Scale3/16 in. : 1 ft.
Object Number: 04481_0353
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0349
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0346
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0375
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0347
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0350
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0344
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0343
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0358
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0357
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0351
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0377
Date: 01/31/2005
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction