Object Number04481_0525
TitleLevel seven HVAC ductwork plan
Date01/25/2008
Additional Creator
Jose Rafael Moneo
Additional Firm
Bard, Rao + Athanas Consulting Engineers, Inc.
Building/Site(s):
Text Entries[Plan]
Project NameLaboratory for Integrated Science and Engineering (LISE) original construction
Project NumberFAS 1999-023
Sheet NumberH2.70
CollectionArchitectural & Technical Drawings
NotesThe Laboratory for Interface Science and Engineering was later renamed the Laboratory for Integrated Science and Engineering.
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
Extent1 drawing
DimensionsOverall: 30 x 42 in. (76.2 x 106.7 cm)
MediumBlackline print
Support / MaterialPolyester film
Scale3/16 in. : 1 ft.
Title: Level seven HVAC piping plan
Object Number: 04481_0548
Date: 01/25/2008
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Title: HVAC level 5 ductwork plan
Object Number: 04481_0953
Date: 09/22/2010
Project Number: SEAS 2010-0145
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: LISE 5 / Weitz- Wyss
Object Number: 04481_0510
Date: 01/25/2008
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0509
Date: 01/25/2008
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0511
Date: 01/25/2008
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0508
Date: 01/25/2008
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Title: Level two HVAC ductwork plan
Object Number: 04481_0520
Date: 01/25/2008
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Title: Level one HVAC ductwork plan
Object Number: 04481_0519
Date: 01/25/2008
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0521
Date: 01/25/2008
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Title: Level six HVAC ductwork plan
Object Number: 04481_0524
Date: 01/25/2008
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0523
Date: 01/25/2008
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction
Object Number: 04481_0526
Date: 01/25/2008
Project Number: FAS 1999-023
Sites: Lab for Integrated Science and Engineering (LISE)
Project Name: Laboratory for Integrated Science and Engineering (LISE) original construction