Skip to main content
Holyoke Freeze Mitigation project O+M manual
Image Not Available for Holyoke Freeze Mitigation project O+M manual

Object NumberPD.0397.001

TitleHolyoke Freeze Mitigation project O+M manual
Date[2006]
Building/Site(s):
Project NameHolyoke Freeze Mitigation project
Project NumberHRES 2006-017
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
Extent1 vol.
Object Number: PD.0542.004
Date: 2009
Project Number: HRES 2007-0106
Sites: Smith Campus Center
Project Name: Holyoke switchgear project
Object Number: PD.0542.002
Date: 2007
Project Number: HRES 2007-0106
Sites: Smith Campus Center
Project Name: Holyoke switchgear project
Object Number: PD.0353.001
Date: 2002
Project Number: HPR 2001-026
Sites: Smith Campus Center
Project Name: Holyoke Tower: HVAC, electrical, code and egress upgrades
Object Number: PD.0541.001
Date: 2007
Project Number: HRES 2003-021
Sites: Smith Campus Center
Project Name: Holyoke Center eighth and tenth floor moves
Object Number: PD.0540.001
Date: 2009
Project Number: FCOR 2009-0106
Sites: Smith Campus Center
Project Name: Holyoke Center Floor 4 / college admin moves
Object Number: PD.0543.001
Date: 2008
Project Number: HRES 2008-0539
Sites: Smith Campus Center
Project Name: Holyoke Center wind turbines
Object Number: PD.0538.001
Date: 2007
Project Number: CADM 2008-0329
Sites: Smith Campus Center
Project Name: Holyoke Center 869 conference room
Object Number: PD.0369.001
Date: 2003
Project Number: HPR 2003-009
Sites: Smith Campus Center
Project Name: Holyoke Center tower - renovate 7th floor computer room
Object Number: PD.0366.001
Date: 2003
Project Number: HPR 2003-001
Sites: Smith Campus Center
Project Name: Holyoke Tower elevator lobby fire doors - code compliance
Object Number: PD.0872.001
Date: 2009
Project Number: HRES 2009-0073
Sites: Smith Campus Center
Project Name: Holyoke Center heating, ventilation, and air conditioning [HVAC] and controls upgrades
Object Number: PD.0458.002
Date: 2000
Project Number: VPF 2000-001
Sites: Smith Campus Center
Project Name: HFAD Holyoke & Story Street relocation/reorganization
Object Number: PD.0398.001
Date: [2006]
Project Number: HRES 2006-020
Sites: Smith Campus Center
Project Name: Renovation of Holyoke 9th Floor for the Allston Development Group