Skip to main content
Electrical details
Media Restricted

Object Number311_1738

TitleElectrical details
Date07/31/2015
Building/Site(s):
Text Entries
1. Fire-rated MI [mineral insulated] installation detail -- 2. Switchboard grounding detail -- 3. Substation shutdown scheme -- 4. Temporary emergency one-line diagram -- Electric equipment control center [schedule] -- Feeder cable schedule -- Housekeeping pad schedule -- Lighting fixture schedule -- Panelboard EMDP-B076 [schedule] -- Drawing notes
Project NumberFCOR 2012-0045
Project NameBiolabs new electric transformer, service vault
Sheet NumberE0.1
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionGood
DimensionsOverall: 36 × 48 in. (91.4 × 121.9 cm)
MediumBlackline print
Support / MaterialPaper
Extent 1 drawing
Scale Not to scale
Object Number: 311_1400
Date: 05/04/1976
Project Number: FAS 1976-027
Sites: Biological Laboratory
Project Name: Update existing wire shafts 5 and 6
Object Number: 311_5275
Date: 11/10/1975
Project Number: FAS 1976-006
Sites: Biological Laboratory
Project Name: Alterations to rooms B542A, 542B, 544, 548, 548B for Dr. Sato
Object Number: 311_7428
Date: 01/13/1997
Project Number: FAS 1997-013
Sites: Biological Laboratory
Project Name: Lab renovations, Professor Palumbi, Bio Labs
Object Number: 311_6284
Date: 04/08/2005
Project Number: FAS 2005-051
Sites: Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6279
Date: 04/08/2005
Project Number: FAS 2005-051
Sites: Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6285
Date: 04/08/2005
Project Number: FAS 2005-051
Sites: Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6301
Date: 01/21/2005
Project Number: FAS 2005-051
Sites: Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6371
Date: 06/03/2005
Project Number: FAS 2006-008
Sites: Biological Laboratory
Project Name: Schier Laboratory, in the Bio-Labs
Object Number: 311_7521
Date: 06/20/1997
Project Number: FAS 1997-010
Sites: Biological Laboratory
Project Name: Lab renovations, Professor Dulac and Peralta, Bio Labs
Object Number: 311_6652
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites: Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6691
Date: [11/09/2009]
Project Number: FCOR 2010-0009
Sites: Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6436
Date: 08/08/2008
Project Number: FCOR 2008-0351
Sites: Biological Laboratory
Project Name: Kramer Lab renovation