Object Number311_1873
TitleFire protection legend, abbreviations, notes, and specifications
Date09/23/2011
Building/Site(s):
Text EntriesFire protection legend -- Fire protection abbreviations -- Fire protection trade notes -- Fire protection demolition notes -- Building fire protection riser diagram -- Fourth floor sprinkler calculation plan -- Fire protection specifications
Project NameBiological Laboratory [OEB] professor in residence
Project NumberFCOR 2012-0046
Sheet NumberFP0.0
Sheet NumberFP-001
CollectionArchitectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
Extent1 drawing
DimensionsOverall: 24 × 36 in. (61 × 91.4 cm)
MediumBlackline print
Support / MaterialPaper
ScaleNot to scale
Object Number: 311_2111
Date: 09/04/2015
Project Number: FCOR 2016-0078
Sites: Biological Laboratory
Project Name: Eddy / Rivas / Schier Tea Room renovation
Object Number: 311_6703
Date: [11/09/2009]
Project Number: FCOR 2010-0009
Sites: Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6855
Date: 10/09/2009
Project Number: FCOR 2010-0021
Sites: Biological Laboratory
Project Name: SCRB Program: Molecular and Cellular Biology [MCB] laboratories and offices
Object Number: 311_3015
Date: 04/16/2018
Project Number: FCOR 2017-0206
Sites: Biological Laboratory
Project Name: Biological Laboratory, Molecular and Cellular Biology Professor Uchida laboratory, FY2018
Object Number: 311_6530
Date: [01/01/2009]
Project Number: FCOR 2009-0125
Sites: Biological Laboratory
Project Name: Biolabs: Professor B. Burton Lab renovation
Object Number: 311_2226
Date: [01/01/2017]
Project Number: FCOR 2017-0039
Sites: Biological Laboratory
Project Name: Biological Laboratory, relocation of Professor Cavanaugh laboratory (heating ventilation air conditioning enabling)
Object Number: 311_2615
Date: [01/01/2017]
Project Number: FCOR 2016-0045
Sites: Biological Laboratory
Project Name: Hoekstra Laboratory renovation
Object Number: 311_1663
Date: 02/17/2012
Project Number: FCOR 2011-0245
Sites: Biological Laboratory
Project Name: Biological Laboratory growth chamber phase 2
Object Number: 311_6659
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites: Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_2315
Date: [01/01/2017]
Project Number: FCOR 2017-0037
Sites: Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Object Number: 311_3514
Date: 01/17/2019
Project Number: FCOR 2019-0030
Sites: Biological Laboratory
Project Name: Biological Laboratory, Bellono Lab renewal
Object Number: 311_3612
Date: [03/01/2019]
Project Number: FCOR 2019-0141
Sites: Biological Laboratory
Project Name: Biolabs Warinner Laboratory