Object Number311_1949
Title[Fire protection as-built]
Date06/18/2015
Firm
Perkins + Will
Building/Site(s):
Text EntriesThird floor plan, partial -- Calculation data -- Sprinkler head schedule -- Drawing legend -- Basement floor plan, partial -- General notes -- [Pipe hanger details] -- Concealed sprinkler head connection -- Upright sprinkler detail
Project NumberFCOR 2014-0261
Project NameGirguis Laboratory in the Biological Laboratories
Sheet NumberFP 1
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPaper
Extent
1 drawing
Scale
As noted
Object Number: 311_2583
Date: 11/09/2015
Project Number: FCOR 2015-0089
Sites:
Biological Laboratory
Project Name: MCB senior appointment - Sean Eddy
Object Number: 311_5195
Date: 03/04/1983
Project Number: FAS 1980-070
Sites:
Biological Laboratory
Project Name: Modernization phase A and B
Object Number: 311_2007
Date: 01/15/2004
Project Number: FAS 2004-005
Sites:
Biological Laboratory
Project Name: Biology, BSL - 2 Facility in room 5008
Object Number: 311_6264
Date: 04/08/2005
Project Number: FAS 2005-051
Sites:
Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Title:
Fire protection - 1st floor
Object Number: 311_6355
Date: 01/31/2006
Project Number: FAS 2006-008
Sites:
Biological Laboratory
Project Name: Schier Laboratory, in the Bio-Labs
Object Number: 311_6263
Date: 04/08/2005
Project Number: FAS 2005-051
Sites:
Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Title:
Fire protection - basement
Object Number: 311_6265
Date: 07/11/2005
Project Number: FAS 2005-051
Sites:
Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6293
Date: 01/21/2005
Project Number: FAS 2005-051
Sites:
Biological Laboratory
Project Name: Zebrafish facility, Professors Dowling and Schier, Biological Labs
Object Number: 311_6354
Date: 05/27/2006
Project Number: FAS 2006-008
Sites:
Biological Laboratory
Project Name: Schier Laboratory, in the Bio-Labs
Object Number: 311_6532
Date: [01/01/2009]
Project Number: FCOR 2009-0125
Sites:
Biological Laboratory
Project Name: Biolabs: Professor B. Burton Lab renovation
Object Number: 311_6566
Date: [01/22/2009]
Project Number: FCOR 2009-0126
Sites:
Biological Laboratory
Project Name: Biolabs: Professor S. Mango Lab renovation project
Object Number: 311_6451
Date: 02/25/2009
Project Number: FCOR 2009-0104
Sites:
Biological Laboratory
Project Name: Biolabs: OEB Growth Chamber Infrastructure
