Object NumberPD.0495.001
TitleHolyoke Center original construction architectural model
Date[1960]
Building/Site(s):
Project NumberPIRC 1960-001
Project NameHolyoke Center original construction - phase 1A
Collection
Related Project Documentation
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionGood
DimensionsOverall: 15 1/2 × 33 3/4 × 22 5/16 in. (39.4 × 85.7 × 56.7 cm)
Object Number: PD.2032.001
Date: 1960-1961
Project Number: PIRC 1960-002
Sites:
Smith Campus Center
Project Name: Holyoke Center original construction
Object Number: PD.0369.001
Date: 2003
Project Number: HPR 2003-009
Sites:
Smith Campus Center
Project Name: Holyoke Center tower - renovate 7th floor computer room
Object Number: PD.0375.001
Date: 2004
Project Number: HRES 2004-001
Sites:
Smith Campus Center
Project Name: Holyoke Center steam to hot water conversions
Object Number: PD.0469.001
Date: 2001
Project Number: HPR 2001-006
Sites:
Smith Campus Center
Project Name: Holyoke Center retail roof replacement
Object Number: PD.0538.001
Date: 2007
Project Number: CADM 2008-0329
Sites:
Smith Campus Center
Project Name: Holyoke Center 869 conference room
Object Number: PD.0538.002
Date: 2007
Project Number: CADM 2008-0329
Sites:
Smith Campus Center
Project Name: Holyoke Center 869 conference room
Object Number: PD.0538.003
Date: 2007
Project Number: CADM 2008-0329
Sites:
Smith Campus Center
Project Name: Holyoke Center 869 conference room
Object Number: PD.0540.001
Date: 2009
Project Number: FCOR 2009-0106
Sites:
Smith Campus Center
Project Name: Holyoke Center Floor 4 / college admin moves
Object Number: PD.0540.002
Date: 2009
Project Number: FCOR 2009-0106
Sites:
Smith Campus Center
Project Name: Holyoke Center Floor 4 / college admin moves
Object Number: PD.0540.003
Date: 2009
Project Number: FCOR 2009-0106
Sites:
Smith Campus Center
Project Name: Holyoke Center Floor 4 / college admin moves
Object Number: PD.0541.001
Date: 2007
Project Number: HRES 2003-021
Sites:
Smith Campus Center
Project Name: Holyoke Center eighth and tenth floor moves
Object Number: PD.0543.001
Date: 2008
Project Number: HRES 2008-0539
Sites:
Smith Campus Center
Project Name: Holyoke Center wind turbines