Object Number330_5133
TitleDirect digital control / automatic temperature control piping flow diagram [revised]
Date12/31/1992
Firm
Exergen Corporation
Building/Site(s):
Text EntriesExisting piping flow diagram -- Sequence of operations -- Proposed modifications -- Valve operations settings -- Existing and new valve schedule -- Pump control wiring
Project NumberFAS 1992-040
Project NamePhase 2 HVAC renovation
Sheet NumberM-11
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionGood
DimensionsOverall: 22 x 34 in. (55.9 x 86.4 cm)
MediumDiazotype
Support / MaterialPaper
Extent
1 drawing
Scale
Not to scale
Object Number: 330_5134
Date: 01/09/1993
Project Number: FAS 1992-040
Sites:
Fanny Peabody Mason Music Building
Project Name: Phase 2 HVAC renovation
Object Number: 330_5278
Date: 12/08/1994
Project Number: FAS 1994-022
Sites:
Fanny Peabody Mason Music Building
Project Name: Phase 3 HVAC renovation
Object Number: 330_5006
Date: 10/10/1991
Project Number: FAS 1992-017
Sites:
Fanny Peabody Mason Music Building
Project Name: Music Building phase 1
Object Number: 330_0744
Date: 02/19/2014
Project Number: FCOR 2014-0078
Sites:
Fanny Peabody Mason Music Building
Project Name: Professor Iyer studio and office
Object Number: 330_5111
Date: 09/22/1992
Project Number: FAS 1992-040
Sites:
Fanny Peabody Mason Music Building
Project Name: Phase 2 HVAC renovation
Object Number: 330_5130
Date: 12/31/1992
Project Number: FAS 1992-040
Sites:
Fanny Peabody Mason Music Building
Project Name: Phase 2 HVAC renovation
Object Number: 330_5005
Date: 08/20/1991
Project Number: FAS 1992-017
Sites:
Fanny Peabody Mason Music Building
Project Name: Music Building phase 1
Object Number: 330_5126
Date: 12/31/1992
Project Number: FAS 1992-040
Sites:
Fanny Peabody Mason Music Building
Project Name: Phase 2 HVAC renovation
Object Number: 330_5127
Date: 12/31/1992
Project Number: FAS 1992-040
Sites:
Fanny Peabody Mason Music Building
Project Name: Phase 2 HVAC renovation
Object Number: 330_5128
Date: 12/31/1992
Project Number: FAS 1992-040
Sites:
Fanny Peabody Mason Music Building
Project Name: Phase 2 HVAC renovation
Object Number: 330_5129
Date: 12/31/1992
Project Number: FAS 1992-040
Sites:
Fanny Peabody Mason Music Building
Project Name: Phase 2 HVAC renovation
Object Number: 330_5135
Date: 12/31/1992
Project Number: FAS 1992-040
Sites:
Fanny Peabody Mason Music Building
Project Name: Phase 2 HVAC renovation