Object NumberWM.W04.0063
TitleUtility details [Kirkland Street chilled water connections]
Date07/31/2015
Building/Site(s):
Text Entries1. Twelve-inch chilled water trench section -- A. Bituminous concrete sidewalk -- B. Chilled water valve and valve box -- C. Typical wall penetration detail -- D. Chilled water above Science Center electric room -- E. Tunnel crossing detail -- Insulation design -- Typical installation -- Proposed installation -- Additional considerations
Project NumberUOS 2015-0012
Project NameChilled water distribution: Kirkland Street connection
Consultants Project Number114324A0
Sheet NumberC4.01
Collection
Maps, Surveys & Infrastructure
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPaper
Object Number: WM.W04.0062
Date: 07/31/2015
Project Number: UOS 2015-0012
Sites:
Central Utilities Plant
Project Name: Chilled water distribution: Kirkland Street connection
Object Number: WM.W04.0060
Date: 07/31/2015
Project Number: UOS 2015-0012
Sites:
Central Utilities Plant
Project Name: Chilled water distribution: Kirkland Street connection
Object Number: WM.W04.0061
Date: 07/31/2015
Project Number: UOS 2015-0012
Sites:
Central Utilities Plant
Project Name: Chilled water distribution: Kirkland Street connection
Object Number: WM.W04.0065
Date: 07/31/2015
Project Number: UOS 2015-0012
Sites:
Memorial Hall
Project Name: Chilled water distribution: Kirkland Street connection
Object Number: WM.W04.0064
Date: 07/31/2015
Project Number: UOS 2015-0012
Project Name: Chilled water distribution: Kirkland Street connection
Object Number: WM.W04.0066
Date: 07/31/2015
Project Number: UOS 2015-0012
Sites:
Central Utilities Plant
Project Name: Chilled water distribution: Kirkland Street connection
Object Number: TM.F5.0006
Date: 06/28/1989
Project Number: PIRC 1989-021
Sites:
Central Utilities Plant
Project Name: Fiber optic cables
Object Number: EM.C6.0051
Date: 08/09/1956
Object Number: EM.C6.0052
Date: 01/16/1928
Object Number: EM.C6.0071
Date: 01/01/1939
Object Number: EM.C6.0053
Date: 01/16/1928
Object Number: UM.CA.0008
Date: 04/02/2013
Project Number: UOS 2010-0137
Sites:
Cambridge Street Underpass
Project Name: Cambridge Street Underpass restoration - utility renewal / expansion