Memorial Hall slate roof replacement phase 2
Project NumberFCOR 2020-0168
Project TypeCapital Level Project
CAPS Activity Code011595
Project DescriptionThe phase 2 entails the replacement of slate and copper at the Transept, including the major and minor gables on both the north and south sides, and the four minor towers. The scope includes some limited masonry repair and painting of window trim where scaffolding allows. The installation of some fall protection anchors at key locations is under consideration.Related Buildings / Sites
Architect
Perry and Radford Architects
Engineer
LeMessurier Associates