Lehman Hall capital renewal FY19
Access to material may be restricted.

Lehman Hall capital renewal FY19

Project NumberFCOL 2019-0205
CAPS Activity Code008307
Project DescriptionServery, re-work left side with new appliances and redone serving line, new lighting, new ceiling, repair and re-coat existing wall tile, replace overhead door, new reach fridge, refurbish cabinets and millwork, painting. Kitchen new pot sink, new convection oven, new dishwasher. New self-service fridge in dining hall. Freight elevator restoration and modernization includes, controller, power unit, controls, electrical, HVAC, engineering fees. Passenger elevator restoration and modernization includes controller, motor, drive, ropes, positioning system, hoist way and car doors, cab restoration, electrical, fire alarm, enlarge and fire proof machine room, HVAC.Related Buildings / Sites