Oberg Laboratory - Perkin Building
Project NumberFCOR 2014-0155
Project TypeCapital Level Project
CAPS Activity Code010571
Project DescriptionNew sprinkler system, fume hood, lab sink. Four combo shower and eye wash stations with drives and controls. Chilled water and lab air piping. Modifications to exist. air handler system. Major demo to old bus duct. New bus duct, electrical panels, lighting, and wiring. New exterior generator with excavation for new pad and wiring for emerg. power. Add GC work for coring through floors, acid waste piping, and roof work.Related Buildings / SitesAssociated
Thomas G. Gallagher, Mechanical Contractors
Engineer
RDK Engineers