Skip to main content
Image Not Available for Rowland Institute plumbing upgrades
Rowland Institute plumbing upgrades
Image Not Available for Rowland Institute plumbing upgrades

Rowland Institute plumbing upgrades

Project NumberFCOR 2014-0105
CAPS Activity Code011970
Project DescriptionScope includes tying all emergency showers and sink face washers into a tempered, recirculating water loop; isolation of all labs from potable water system with branch valves; and installing new boiler to handle these changes.Related Buildings / Sites