Object Number313C_1042
TitleHVAC third floor piping demolition floor plan
Date07/10/2015
Firm
Ellenzweig
Firm
BR+A
Building/Site(s):
Text Entries1. HVAC third floor piping demolition plan -- 2. HVAC third floor upper level piping demolition plan -- General notes -- Key notes
Project NameBetley Laboratory expansion, third floor
Project NumberFCOR 2015-0195
Consultants Project Number31409
Sheet NumberHD3.3
CollectionArchitectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
Extent1 drawing
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPaper
Scale3/16 in. : 1 ft.
Object Number: 313C_0986
Date: 02/14/2014
Project Number: FCOR 2013-0248
Sites: Mallinckrodt Chemistry Laboratory
Project Name: Mallinckrodt Cohen Laboratory expansion
Object Number: 313C_0985
Date: 02/14/2014
Project Number: FCOR 2013-0248
Sites: Mallinckrodt Chemistry Laboratory
Project Name: Mallinckrodt Cohen Laboratory expansion
Object Number: 313C_1043
Date: 11/13/2015
Project Number: FCOR 2015-0195
Sites: Mallinckrodt Chemistry Laboratory
Project Name: Betley Laboratory expansion, third floor
Object Number: 313C_1039
Date: 07/10/2015
Project Number: FCOR 2015-0195
Sites: Mallinckrodt Chemistry Laboratory
Project Name: Betley Laboratory expansion, third floor
Object Number: 313C_1047
Date: 02/02/2016
Project Number: FCOR 2015-0195
Sites: Mallinckrodt Chemistry Laboratory
Project Name: Betley Laboratory expansion, third floor
Object Number: 313C_0937
Date: 07/01/2011
Project Number: FCOR 2011-0219
Sites: Mallinckrodt Chemistry Laboratory
Project Name: Mallinckrodt Chemistry Laboratory third floor Balskus Laboratory Department of Chemistry and Chemical Biology
Object Number: 313A_1321
Date: 09/15/2017
Project Number: FCOR 2016-0312
Sites: Converse Chemistry Laboratory
Project Name: Chemistry laboratory renovation for Professor Liau
Object Number: 313C_1040
Date: 02/02/2016
Project Number: FCOR 2015-0195
Sites: Mallinckrodt Chemistry Laboratory
Project Name: Betley Laboratory expansion, third floor
Title: Third floor piping plan
Object Number: 313C_5412
Date: 08/13/1998
Project Number: FAS 1997-009
Sites: Mallinckrodt Chemistry Laboratory
Project Name: First and third floor renovations
Object Number: 313C_5767
Date: 11/30/2002
Project Number: FAS 2003-006
Sites: Mallinckrodt Chemistry Laboratory
Project Name: Lab renovations for Profesor Shair
Object Number: 313C_5776
Date: 11/30/2002
Project Number: FAS 2003-005
Sites: Mallinckrodt Chemistry Laboratory
Project Name: Lab renovations for Professor White
Object Number: 313C_5741
Date: 02/02/2001
Project Number: FAS 2000-021
Sites: Mallinckrodt Chemistry Laboratory
Project Name: MB-9 renovation; first and second floor fit-out