Skip to main content
Foundation sections and details
Media Restricted

Object Number862_0910

TitleFoundation sections and details
Date11/11/2013
Building/Site(s):
Text Entries
1. Typical pressure injected footing (PIF) and pile cap. Seismic design category -- 2. Pile cap details -- 3. Grade beam schedule -- 4. Grade beam reinforcing diagram -- 5. Footing schedule -- 6. Elevator pit detail -- 7. Reinforcement detail at pile cap and grade beam interference -- 8. Grade beam section -- 9. Slab on grade to framed slab transition -- 10. Existing elevator pit infill
Project NumberFATH 2013-0047
Project NameBright Arena addition and renovation
Consultants Project Number1214
Sheet NumberS-4.01
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPaper
Scale As indicated
Object Number: 862_0422
Date: 07/10/1953
Project Number: PIRC 1953-002
Sites: Bright-Landry Hockey Center
Project Name: Bright Hockey Center original construction (Watson Rink)
Object Number: 862_0036
Date: 06/09/1976
Project Number: FAS 1974-007
Sites: Blodgett Pool
Project Name: Athletic Facilities, phase 1 Soldiers Field, Allston, MA
Object Number: 862_0054
Date: 06/09/1976
Project Number: FAS 1974-007
Sites: Bright-Landry Hockey Center
Project Name: Athletic Facilities, phase 1 Soldiers Field, Allston, MA
Object Number: 862_0067
Date: 06/30/1976
Project Number: FAS 1974-007
Sites: Bright-Landry Hockey Center
Project Name: Athletic Facilities, phase 1 Soldiers Field, Allston, MA
Object Number: 862_0035
Date: 06/09/1976
Project Number: FAS 1974-007
Sites: Blodgett Pool
Project Name: Athletic Facilities, phase 1 Soldiers Field, Allston, MA
Object Number: 862_0046
Date: 06/09/1976
Project Number: FAS 1974-007
Sites: Bright-Landry Hockey Center
Project Name: Athletic Facilities, phase 1 Soldiers Field, Allston, MA
Object Number: 862_0047
Date: 06/09/1976
Project Number: FAS 1974-007
Sites: Bright-Landry Hockey Center
Project Name: Athletic Facilities, phase 1 Soldiers Field, Allston, MA
Object Number: 862_0045
Date: 06/09/1976
Project Number: FAS 1974-007
Sites: Bright-Landry Hockey Center
Project Name: Athletic Facilities, phase 1 Soldiers Field, Allston, MA
Object Number: 862_0060
Date: 06/09/1976
Project Number: FAS 1974-007
Sites: Bright-Landry Hockey Center
Project Name: Athletic Facilities, phase 1 Soldiers Field, Allston, MA
Object Number: 862_0604
Date: 09/19/1978
Project Number: PIRC 1978-031
Sites: Bright-Landry Hockey Center
Project Name: Watson Rink renovation
Object Number: 862_0426
Date: 08/18/1953
Project Number: PIRC 1953-002
Sites: Bright-Landry Hockey Center
Project Name: Bright Hockey Center original construction (Watson Rink)
Object Number: 862_0555
Date: [01/01/1999]
Project Number: FAS 1999-027
Sites: Bright-Landry Hockey Center
Project Name: Roof replacement