Skip to main content
Cabot and Whitman Hall roof renewal: CAPS project close-out materials
Image Not Available for Cabot and Whitman Hall roof renewal: CAPS project close-out materials

Object Number2024.10.17.01

TitleCabot and Whitman Hall roof renewal: CAPS project close-out materials
DescriptionMaterials for this project have been received by the PIRC and are not yet fully cataloged, but may be made available to patrons upon request. Please contact PIRC staff for more information.
Date2024
Building/Site(s):
Project NumberFCOL 2024-0261
Project NameCabot and Whitman Hall roof renewal
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
Extent 40 drawings
Object Number: 2025.02.24.02
Date: 2025
Project Number: FCOL 2024-0264
Sites: Cabot House
Project Name: Cabot House administrative offices relocation
Object Number: 2024.05.17.06
Date: 2022
Project Number: FCOR 2022-0265
Sites: 69 Dunster Street
Project Name: 69 Dunster Street renewal
Object Number: 2024.06.27.01
Date: 2023
Project Number: HRES 2023-0281
Sites: Peabody Terrace Building Y
Project Name: Peabody Terrace façade renewal phase 2
Object Number: 2024.07.09.02
Date: 2022
Project Number: UOS 2022-0189
Sites: Weld Boat House
Project Name: Electric utility renewal - Weld Boathouse
Object Number: 2024.07.09.03
Date: 2023
Project Number: SEAS 2022-0126
Sites: Maxwell-Dworkin
Project Name: Renewal - Pierce-Maxwell Dworkin bridge envelope repair
Object Number: 2024.07.11.01
Date: 2022-2024
Project Number: FATH 2023-0017
Sites: Newell Boat House
Project Name: Newell Boathouse renovation
Object Number: 2023.07.18.02
Date: 2023
Project Number: HRES 2021-0077
Sites: Smith Campus Center
Project Name: Smith Campus Center 3rd floor bathroom renewal
Object Number: 2024.03.18.05
Date: 2023
Project Number: FCOR 2022-0225
Sites: Bauer Laboratory (Life Sciences Building)
Project Name: Bauer envelope renewal
Object Number: 2024.05.17.02
Date: 2023-2024
Project Number: HRES 2022-0235
Sites: Smith Campus Center
Project Name: Smith Campus Center 6th floor restroom renewal & tower ventilation
Object Number: 2024.06.25.02
Date: 2024
Project Number: FCOR 2024-0172
Sites: Northwest Building
Project Name: NW Professor Garner lounge 441 renewal
Object Number: 2016.08.16.01
Date: 2012-2016
Project Number: FCOL 2011-0243
Sites: 1201 Massachusetts Avenue
Project Name: House renewal swing space
Object Number: 2019.04.03.01
Date: 05/23/2018
Project Number: FCOR 2018-0003
Sites: Converse Chemistry Laboratory
Project Name: Converse Chemisitry Laboratory, Chemistry and Chemical Biology Professor Mason laboratory renewal