Skip to main content
Northwest Labs floor four north systems biology phase two: CAPS project close-out materials
Image Not Available for Northwest Labs floor four north systems biology phase two: CAPS project close-out materials

Object Number2009.11.23.01

TitleNorthwest Labs floor four north systems biology phase two: CAPS project close-out materials
DescriptionMaterials for this project have been received by the PIRC and are not yet fully cataloged, but may be made available to patrons upon request. Please contact PIRC staff for more information.
Date2008
Building/Site(s):
Project NameNorthwest Labs floor four north systems biology phase 2
Project NumberFCOR 2008-0416
NotesDrawings for this project were rolled into Northwest Labs floor 3 north systembs biology phase 2. For more information, please see FCOR 2008-0419.
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
Object Number: 2014.03.14.03
Date: 03/14/2014
Project Number: SEAS 2013-0002
Sites: Northwest Building
Project Name: NWB1 Lewis Lab fit-out
Object Number: 2014.03.14.01
Date: 2013
Project Number: SEAS 2013-0030
Sites: Northwest Building
Project Name: Northwest Building Aizenberg laboratory fit-out
Object Number: 2009.11.23.02
Date: 12/30/2008
Project Number: FCOR 2008-0420
Sites: Northwest Building
Project Name: NWL Fl. B4 Neurotechnology Core
Object Number: 2009.11.23.03
Date: 12/30/2008
Project Number: FCOR 2008-0553
Sites: Northwest Building
Project Name: NWL Needleman animal holding level 3
Object Number: 2021.11.15.02
Date: 2019
Project Number: SEAS 2020-0244
Sites: Allston Science and Engineering Complex
Project Name: Faculty labs SEC phase 2 (Vijay Reddi, Jia Liu, Na Li)
Object Number: 2023.10.10.02
Date: 2023
Project Number: SEAS 2023-0012
Sites: Gordon McKay Laboratory
Project Name: Faculty dry and wet labs - Bertoldi Lab expansion
Object Number: 2021.11.15.01
Date: 2019
Project Number: FCOR 2019-0143
Sites: Biological Laboratory
Project Name: Biology HVAC [heating, ventilation, and air conditioning] system replacement, phase 3
Object Number: 2023.07.25.01
Date: 2022
Project Number: SPH 2020-0115
Project Name: FXB 3rd floor, IID Mosquito Insectary, wet & dry labs, office/conference rooms
Object Number: 2022.03.10.01
Date: 2020
Project Number: FCOR 2019-0192
Sites: Museum of Comparative Zoology
Project Name: MCZ [Museum of Comparative Zoology] Reich HEB [Human and Evolutionary Biology] 5th floor office suite
Object Number: 2019.04.03.01
Date: 05/23/2018
Project Number: FCOR 2018-0003
Sites: Converse Chemistry Laboratory
Project Name: Converse Chemisitry Laboratory, Chemistry and Chemical Biology Professor Mason laboratory renewal
Object Number: 2023.07.06.08
Date: 2021
Project Number: SEAS 2021-0027
Project Name: Faculty dry lab fit-out Walsh ATI (replacement Wyss lab)
Object Number: 2023.07.24.01
Date: 2022
Project Number: SPH 2022-0091
Project Name: SPH 1 IID Lab 117, 119, 121 Neafsey