Object Number04560_1650
TitleHVAC details
Date07/10/2010
Firm
Payette
Firm
CCR Pyramid
Building/Site(s):
Text EntriesPackage computer CAC [central air conditioning] ducted AC unit (with humidifier) -- Supply box with coil and downstream sound attenuator -- Laboratory pressurization control system: supply air valve assembly installation detail -- Laboratory pressurization control system: general exhaust air valve assembly installation detail -- Laboratory pressurization control system: fume hood exhaust air valve assembly installation detail -- Small steam sterilizer connection -- Manual air vent -- Pump exhaust "thimble" connection -- In-duct or terminal box reheat coil with central strainer -- Environmental room duct connections (typical) -- Vertical in-line exhaust fan above roof -- Vertical two-pipe fan coil unit piping -- Radiant panel piping (3 pass) -- Environmental room piping connections (typical) -- Chilled water system pipinig for laboratory equipment [and schedule]
Project NumberFCOR 2010-0018
Project NameSCRB program: MCB laboratories and offices - NWL
Sheet NumberH5.02
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 30 × 42 in. (76.2 × 106.7 cm)
MediumBlackline print
Support / MaterialPolyester film
Extent
1 drawing
Scale
1/4 in. : 1 ft.
Title:
HVAC details
Object Number: 04560_1649
Date: 07/10/2010
Project Number: FCOR 2010-0018
Sites:
Northwest Building
Project Name: SCRB program: MCB laboratories and offices - NWL
Title:
HVAC details
Object Number: 04560_1519
Date: 11/24/2009
Project Number: FCOR 2010-0018
Sites:
Northwest Building
Project Name: SCRB program: MCB laboratories and offices - NWL
Title:
HVAC details
Object Number: 04560_1520
Date: 11/24/2009
Project Number: FCOR 2010-0018
Sites:
Northwest Building
Project Name: SCRB program: MCB laboratories and offices - NWL
Title:
HVAC details
Object Number: 04560_1740
Date: 09/07/2011
Project Number: FCOR 2011-0024
Sites:
Northwest Building
Project Name: Northwest Labs B4 neuroimaging expansion (animal magnet)
Title:
HVAC details
Object Number: 04560_1741
Date: 09/07/2011
Project Number: FCOR 2011-0024
Sites:
Northwest Building
Project Name: Northwest Labs B4 neuroimaging expansion (animal magnet)
Title:
HVAC details
Object Number: 04560_1742
Date: 09/07/2011
Project Number: FCOR 2011-0024
Sites:
Northwest Building
Project Name: Northwest Labs B4 neuroimaging expansion (animal magnet)
Title:
HVAC details
Object Number: 04560_1836
Date: 03/18/2011
Project Number: SEAS 2010-0056
Sites:
Northwest Building
Project Name: Northwest Lab / B1 level Wyss
Title:
HVAC details
Object Number: 04560_1837
Date: 03/18/2011
Project Number: SEAS 2010-0056
Sites:
Northwest Building
Project Name: Northwest Lab / B1 level Wyss
Title:
HVAC details
Object Number: 04560_1838
Date: 03/18/2011
Project Number: SEAS 2010-0056
Sites:
Northwest Building
Project Name: Northwest Lab / B1 level Wyss
Title:
HVAC standard details
Object Number: 04560_1068
Date: 03/05/2009
Project Number: FCOR 2008-0382
Sites:
Northwest Building
Project Name: NWL Neuroimaging B4
Title:
HVAC details
Object Number: 04560_1165
Date: 03/04/2009
Project Number: FCOR 2008-0419
Sites:
Northwest Building
Project Name: Northwest Labs floor 3 north systembs biology phase 2
Object Number: 04560_1007
Date: 02/18/2009
Project Number: FAS 2004-016
Sites:
Northwest Building
Project Name: Northwest building [original construction of North West Labs, NWL