Object Number311_1663
TitleFire protection legend, notes, and abbreviations
Date02/17/2012
Building/Site(s):
Text EntriesFire protection legend -- Fire protection abbreviations -- Fire protection trade notes -- Fire protection demolition notes -- General notes -- Building fire protection riser diagram
Project NumberFCOR 2011-0245
Project NameBiological Laboratory growth chamber phase 2
Sheet NumberF001
Sheet NumberFP0.00
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
ConditionVery Good
DimensionsOverall: 24 × 36 in. (61 × 91.4 cm)
MediumBlackline print
Support / MaterialPaper
Object Number: 311_6659
Date: [12/23/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6530
Date: [01/01/2009]
Project Number: FCOR 2009-0125
Sites:
Biological Laboratory
Project Name: Biolabs: Professor B. Burton Lab renovation
Object Number: 311_6703
Date: [11/09/2009]
Project Number: FCOR 2010-0009
Sites:
Biological Laboratory
Project Name: Biolabs: Professor Engert lab suite renovation
Object Number: 311_6564
Date: [01/22/2009]
Project Number: FCOR 2009-0126
Sites:
Biological Laboratory
Project Name: Biolabs: Professor S. Mango Lab renovation project
Object Number: 311_6855
Date: 10/09/2009
Project Number: FCOR 2010-0021
Sites:
Biological Laboratory
Project Name: SCRB Program: Molecular and Cellular Biology [MCB] laboratories and offices
Object Number: 311_1873
Date: 09/23/2011
Project Number: FCOR 2012-0046
Sites:
Biological Laboratory
Project Name: Biological Laboratory [OEB] professor in residence
Object Number: 311_1946
Date: 09/19/2015
Project Number: FCOR 2014-0261
Sites:
Biological Laboratory
Project Name: Girguis Laboratory in the Biological Laboratories
Object Number: 311_2109
Date: 09/04/2015
Project Number: FCOR 2016-0078
Sites:
Biological Laboratory
Project Name: Eddy / Rivas / Schier Tea Room renovation
Object Number: 311_2226
Date: [01/01/2017]
Project Number: FCOR 2017-0039
Sites:
Biological Laboratory
Project Name: Biological Laboratory, relocation of Professor Cavanaugh laboratory (heating ventilation air conditioning enabling)
Object Number: 311_2315
Date: [01/01/2017]
Project Number: FCOR 2017-0037
Sites:
Biological Laboratory
Project Name: Biological Laboratory, fifth floor north wing renewal for FlyBase
Object Number: 311_2422
Date: [07/24/2015]
Project Number: FCOR 2015-0137
Sites:
Biological Laboratory
Project Name: Department of Organismic and Evolutionary Biology, professor Cassandra Extavour Laboratory expansion
Object Number: 311_2615
Date: [01/01/2017]
Project Number: FCOR 2016-0045
Sites:
Biological Laboratory
Project Name: Hoekstra Laboratory renovation