Object Number2024.02.16.02
TitleFXB roof replacement: CAPS project close-out materials
DescriptionMaterials for this project have been received by the PIRC and are not yet fully cataloged, but may be made available to patrons upon request. Please contact PIRC staff for more information.Date2022
Building/Site(s):
Project NameFXB roof replacement
Project NumberSPH 2020-0061
CollectionArchitectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
Extent13 drawings + related project documenation
Object Number: 2023.07.25.01
Date: 2022
Project Number: SPH 2020-0115
Sites: F.X. Bagnoud Building
Project Name: FXB 3rd floor, IID Mosquito Insectary, wet & dry labs, office/conference rooms
Object Number: 2024.07.25.01
Date: 2023-2024
Project Number: SPH 2024-0105
Sites: F.X. Bagnoud Building
Project Name: IID BSL Imaging Core & room 417 FXB
Object Number: 2023.07.06.08
Date: 2021
Project Number: SEAS 2021-0027
Sites: Allston Science and Engineering Complex
Project Name: Faculty dry lab fit-out Walsh ATI (replacement Wyss lab)
Object Number: 2023.04.21.07
Date: 2008
Project Number: UOS 2007-0282
Sites: Leverett House - Tower F
Project Name: Leverett Towers transformer replacements
Title: Smith Campus Center 10th floor patio window system replacement: CAPS project close-out materials
Object Number: 2023.05.19.01
Date: 2023
Project Number: HRES 2023-0091
Sites: Smith Campus Center
Project Name: Smith Campus Center 10th floor patio window system replacement
Object Number: 2023.07.05.09
Date: 2021
Project Number: HRES 2021-0136
Sites: 5 Cowperthwaite Street
Project Name: 5 Cowperthwaite Street sealant replacement
Object Number: 2023.07.05.08
Date: 2020
Project Number: HRES 2021-0135
Sites: Cronkhite Center
Project Name: Cronkhite Graduate Center partial roof replacement
Object Number: 2021.11.15.01
Date: 2019
Project Number: FCOR 2019-0143
Sites: Biological Laboratory
Project Name: Biology HVAC [heating, ventilation, and air conditioning] system replacement, phase 3
Title: Memorial Hall slate roof replacement, phase I (Sanders Theatre): CAPS project close-out materials
Object Number: 2022.03.15.01
Date: 2020
Project Number: FCOR 2019-0061
Sites: Memorial Hall
Project Name: Memorial Hall slate roof replacement, phase I (Sanders Theatre)
Object Number: 2024.01.30.02
Date: 2023
Project Number: HRES 2021-0102
Sites: 8 Story Street
Project Name: 8 Story Street window replacement
Object Number: 2024.03.18.01
Date: 2023
Project Number: FCOR 2020-0168
Sites: Memorial Hall
Project Name: Memorial Hall slate roof replacement phase 2
Object Number: 2024.03.18.04
Date: 2023
Project Number: FCOR 2022-0086
Sites: Memorial Hall
Project Name: Memorial Hall slate roof replacement phase 3