Object Number2024.03.18.04
TitleMemorial Hall slate roof replacement phase 3: CAPS project close-out materials
DescriptionMaterials for this project have been received by the PIRC and are not yet fully cataloged, but may be made available to patrons upon request. Please contact PIRC staff for more information.Date2023
Building/Site(s):
Project NumberFCOR 2022-0086
Project NameMemorial Hall slate roof replacement phase 3
Collection
Architectural & Technical Drawings
Access NoteAccess to Property Information Resource Center collections is restricted to approved Harvard University staff, or by permission.
Reproduction NoteNo portion of this object shall be reproduced, released, or distributed by any means without the express written permission of the Harvard University Property Information Resource Center.
Extent
15 drawings + related project documentation
Object Number: 2024.03.18.01
Date: 2023
Project Number: FCOR 2020-0168
Sites:
Memorial Hall
Project Name: Memorial Hall slate roof replacement phase 2
Title:
Memorial Hall slate roof replacement, phase I (Sanders Theatre): CAPS project close-out materials
Object Number: 2022.03.15.01
Date: 2020
Project Number: FCOR 2019-0061
Sites:
Memorial Hall
Project Name: Memorial Hall slate roof replacement, phase I (Sanders Theatre)
Object Number: 2025.04.21.02
Date: 2024
Project Number: FCOR 2024-0051
Sites:
Memorial Hall
Project Name: Memorial Hall fire alarm equipment replacement
Object Number: 2024.04.30.03
Date: 2023
Project Number: HRES 2023-0220
Sites:
Howells Memorial
Project Name: Howells Memorial tennis court redesign
Object Number: 2017.04.13.01
Date: 03/27/2017
Project Number: HRES 2016-0028
Sites:
Memorial Church, Appleton Chapel
Project Name: Memorial Church heating, ventilation, and air-conditioning upgrades
Object Number: 2023.05.12.01
Date: 02/10/2023
Project Number: HRES 2022-0167
Sites:
Memorial Church, Appleton Chapel
Project Name: Memorial Church audiovisual
Object Number: 2021.11.15.01
Date: 2019
Project Number: FCOR 2019-0143
Sites:
Biological Laboratory
Project Name: Biology HVAC [heating, ventilation, and air conditioning] system replacement, phase 3
Object Number: 2023.07.06.08
Date: 2021
Project Number: SEAS 2021-0027
Sites:
Allston Science and Engineering Complex
Project Name: Faculty dry lab fit-out Walsh ATI (replacement Wyss lab)
Object Number: 2024.01.30.03
Date: 2023
Project Number: HRES 2022-0255
Sites:
20-20A Prescott Street
Project Name: 20-20A Prescott facade phase 3
Object Number: 2024.02.21.01
Date: 2023
Project Number: HRES 2022-0255
Sites:
20-20A Prescott Street
Project Name: 20-20A Prescott Facade Phase 3
Object Number: 2019.01.30.01
Date: 2017
Project Number: HRES 2016-0234
Sites:
Soldiers Field Park 3
Project Name: Soldiers Field Park housing renovation phase 2, building 3
Title:
Smith Campus Center 10th floor patio window system replacement: CAPS project close-out materials
Object Number: 2023.05.19.01
Date: 2023
Project Number: HRES 2023-0091
Sites:
Smith Campus Center
Project Name: Smith Campus Center 10th floor patio window system replacement